Trench Sloping and Benching Calculator

OSHA sloping and benching, worked out. Pick the soil type and the Appendix B layout, enter the depth, bottom width and length, and get the maximum slope, the top width, bank yards, the extra dirt over a vertical-wall dig, and truck loads.

Loading calculator…

OSHA Table B-1 maximum slopes

The maximum slope for each soil type, and what it means for a 10 ft deep trench with a 4 ft bottom, 100 ft long. Angles are Table B-1’s, which it notes have been rounded off.

Soil or rockMax slope (H:V)AngleTop widthBank yd³Extra over vertical
Stable rockVertical90°4 ft148.150.00
Type A3/4:153°19 ft425.93277.78
Type A, short term12 ft or less, open 24 hours or less1/2:163°14 ft333.33185.19
Type B1:145°24 ft518.52370.37
Type C1½:134°34 ft703.70555.56
Not classified1926.652(b)(1)1½:134°34 ft703.70555.56

California’s Title 8 §1541.1 Appendix B uses the same maximum slopes.

Sloping and benching layouts in Appendix B

  • Simple slope: one straight face from the bottom corner to grade at the soil’s maximum slope. Every soil type has it.
  • Benches: the first step at the bottom is 4 ft max; steps above it are 5 ft max in Type A and 4 ft max in Type B, to 20 ft total. Type B benches are for cohesive soil only. Appendix B has no benching configuration for Type C soil. The figures draw the maximum slope line from the bottom corner with each bench corner on it, so a benched cut has the same top width as the simple slope. Appendix B gives no bench widths; this assumes each bench corner sits on the maximum slope line, as the figures show.
  • Vertical lower side, unsupported (Type A only): 3½ ft max. Up to 8 ft deep the slope above is 3/4:1; over 8 ft and up to 12 ft it is 1:1. Deeper than 12 ft, the vertical side has to be supported.
  • Vertical lower side, shored or shielded (Types A, B and C, to 20 ft): the slope above is the soil’s maximum, and the support or shield has to reach at least 18 in above the top of the vertical side.
  • Layered soil: Figure B-1.4 sets a slope for each layer, and Appendix A classifies a layered system by its weakest layer. The calculator does not lay out layers; use the weakest layer’s type, and your competent person classifies each layer.

The math, shown transparently

The cross-section is symmetric. m is the horizontal run per foot of rise (0.75 for 3/4:1).

// Simple slope (the line starts at the bottom corner)

top_width = bottom + 2 × m × depth

area_ft² = bottom × depth + m × depth²

// Single bench, first step h (bench corner on the slope line)

area_ft² = bottom × depth + m × depth² - m × h²

// Vertical lower side of height h, slope above it

top_width = bottom + 2 × m × (depth - h)

area_ft² = bottom × depth + m × (depth - h)²

// Yards

bank_yd³ = area_ft² × length / 27

extra_yd³ = bank_yd³ - bottom × depth × length / 27

loose_yd³ = bank_yd³ × swell (the dug material, not the OSHA type)

Worked example

A 10 ft deep trench, 4 ft across the bottom, 100 ft long, as a simple slope:

vertical walls = 4 × 10 × 100 / 27 = 148.15 yd³

// Type A, 3/4:1

top width = 4 + 2 × 0.75 × 10 = 19 ft

area = 4 × 10 + 0.75 × 10² = 115 ft²

bank = 115 × 100 / 27 = 425.93 yd³

extra = 0.75 × 10² × 100 / 27 = 277.78 yd³

// Type B, 1:1

top width = 4 + 2 × 1 × 10 = 24 ft

area = 4 × 10 + 1 × 10² = 140 ft²

bank = 140 × 100 / 27 = 518.52 yd³

extra = 1 × 10² × 100 / 27 = 370.37 yd³

// Type C, 1½:1

top width = 4 + 2 × 1.5 × 10 = 34 ft

area = 4 × 10 + 1.5 × 10² = 190 ft²

bank = 190 × 100 / 27 = 703.70 yd³

extra = 1.5 × 10² × 100 / 27 = 555.56 yd³

// Type B single bench, cohesive soil, 4 ft first step

area = 4 × 10 + 1 × 10² - 1 × 4² = 124 ft², bank 459.26 yd³, top width 24 ft

A Type A multiple bench at 10 ft has a 4 ft first step and two 3 ft steps (the 6 ft above the first step in as few equal steps as the 5 ft limit allows): 431.48 bank yd³, the same 19 ft top width as the Type A slope.

Sources and assumptions

Frequently asked questions

How wide is the top of a 10 ft deep trench?

Top width is the bottom width plus twice the slope times the depth. With a 4 ft bottom: Type A (3/4:1) 4 + 2 × 0.75 × 10 = 19 ft, Type B (1:1) 24 ft, and Type C or soil that is not classified (1½:1) 34 ft. Stable rock can stand vertical, so the top stays 4 ft. A benched cut in Appendix B has the same top width as the simple slope, because the maximum slope line runs from the bottom corner.

What slope does OSHA require if the soil is not classified?

1½ horizontal to 1 vertical (34 degrees), laid out like the Type C configurations in Appendix B (1926.652(b)(1)). OSHA’s trenching booklet puts it as: for every foot of depth, the trench must be excavated back 1½ feet.

Can you bench Type C soil?

Appendix B has no benching configuration for Type C soil, and soil that is not classified takes the Type C layouts. Type B benches are allowed in cohesive soil only; the Appendix B figures say “This bench allowed in cohesive soil only.” Any other layout has to come from tabulated data or be approved by a registered professional engineer (1926.652(b)(3) and (b)(4)).

How tall can each bench step be?

In the Appendix B figures the first step at the bottom is 4 ft max. Steps above it are 5 ft max in Type A and 4 ft max in Type B, to a total depth of 20 ft. The OSHA Technical Manual says the same and adds that all subsequent benches must be below the maximum allowable slope for that soil type. Appendix B does not give bench widths.

When do you need an engineer?

Over 20 ft deep. Table B-1 note 3: “Sloping or benching for excavations greater than 20 feet deep shall be designed by a registered professional engineer.” A sloping or benching system that does not follow the 1½:1 default, Appendices A and B, or tabulated data also has to be approved by a registered professional engineer (1926.652(b)(4)). The calculator gives no result past 20 ft.

How far back do spoil piles go?

At least 2 ft from the edge of the excavation, or held back with retaining devices, or both (1926.651(j)(2)). On a sloped cut the edge is the top of the slope, so measure from the top width, not the bottom. The 10 ft deep Type B trench above is 24 ft across the top, so spoil starts at least 12 + 2 = 14 ft from the centerline.

Is sloping cheaper than a trench box?

The calculator has no prices, so it answers in dirt. Sloping digs more bank yards than vertical walls with the same bottom width: slope × depth² × length / 27. A 10 ft deep, 100 ft run with a 4 ft bottom is 148.15 bank yd³ with vertical walls; sloping adds 277.78 yd³ in Type A, 370.37 yd³ in Type B and 555.56 yd³ in Type C. Weigh digging, hauling and backfilling those yards against the box on your job.

What is the Type A short-term slope?

1/2:1 (63 degrees), only for a simple slope in Type A soil that is 12 ft deep or less and open 24 hours or less (Table B-1 note 2 and Figure B-1.1). Deeper than 12 ft, the short-term slope is 3/4:1. It does not apply to benches or vertical lower sides.